Break-even Analysis of AWS Direct Connect Flat-rate Pricing: Seoul Region
Key point
For the Seoul region, flat-rate pricing becomes cheaper than pay-as-you-go when monthly data transfer out exceeds 114 TB with a port-pair configuration.
Details
On September 15, 2026, AWS launched Flat-rate pricing for 10 Gbps and 100 Gbps dedicated connections. By paying a fixed hourly rate, Data Transfer Out (DTO) costs within the selected Tier range are waived, enabling cost predictability. This analysis presents the break-even point and configuration selection criteria for flat-rate pricing compared to pay-as-you-go, using a case study of operating two 10 Gbps dedicated connections in the Seoul region.
Break-even Point and Cost Savings
Based on calculations for Tier 1 paths between the Seoul region and Seoul Direct Connect locations, the monthly DTO volume where flat-rate pricing becomes advantageous is as follows:
- 1 Port-pair (Available capacity 10 Gbps): Advantageous when exceeding approximately 114 TB per month (average 376 Mbps)
- 2 Independent connections (Available capacity 20 Gbps): Advantageous when exceeding approximately 309 TB per month (average 1.01 Gbps)
Flat-rate pricing is more cost-efficient than pay-as-you-go even with consistent usage of around 5% of line capacity. Based on a virtual bill (average 6 Gbps usage), switching is expected to result in 89.81% cost savings for a port-pair configuration and 79.63% for an independent connection configuration.
Difference Between Port-pair and Independent Connections
With flat-rate pricing, the configuration of two physical lines affects both pricing and capacity.
- Port-pair: Bundles two ports to provide built-in redundancy, with the second port included in the price. However, available capacity is limited to that of one port (10 Gbps).
- Independent connection: Operates each connection individually to fully utilize capacity, but requires additional ports for redundancy, doubling the cost.
If peak traffic is 10 Gbps or less, one port-pair is sufficient. If 20 Gbps is required and capacity must be maintained during failures, consider two port-pairs or two independent connections.
Pre-migration Considerations
Before switching to flat-rate pricing, the following constraints must be verified:
- Tier range: DTO to regions not included in the selected Tier is billed separately.
- Eligibility: Flat-rate pricing applies only to Dedicated Connections, not hosted connections.
- Change limits: Pricing plan changes are limited to a maximum of 3 times in the last 6 months, and all connections in the same location must use the same pricing plan.
- Separately billed items: Transit Gateway data processing fees, cross-connects, and telecom line fees are not included in the flat rate.
This summary was generated automatically by AI. Check the original for the author's claims and context. Copyright belongs to the original author.
Our guide explains how the AI works. Report summary errors, attribution issues, or removal requests via Contact.