FuriosaAI Expands European AI Infrastructure by Deploying RNGD at Equinix Lisbon Data Center
Key point
FuriosaAI is installing RNGD servers at Equinix's Lisbon data center, expanding AI inference infrastructure for European enterprises.
Details
FuriosaAI announced that it will install RNGD AI inference accelerator servers at Equinix's Lisbon LS2 data center to broaden its AI infrastructure presence in Europe. In collaboration with its flagship office established in Lisbon, the company plans to provide an environment where European enterprises can directly evaluate the performance and ease of use of the Furiosa architecture on the latest models.
The RNGD inference architecture is based on a 5nm TCP (Tensor Contraction Processor) architecture, delivering 512 TFLOPS FP8 performance within a low-power design of 180W TDP per accelerator. The NXT RNGD Server built on this integrates up to 8 accelerators to achieve high compute density, boasting performance-per-power efficiency optimized for agentic AI applications.
Meanwhile, FuriosaAI recently partnered with Broadcom to begin development of its 3rd-generation inference accelerator. This next-generation chip is designed to deliver breakthrough performance-per-power when running massive models with over 1 trillion parameters on hyperscale infrastructure.
This summary was generated automatically by AI. Check the original for the author's claims and context. Copyright belongs to the original author.
Our guide explains how the AI works. Report summary errors, attribution issues, or removal requests via Contact.