Yogiyo Product Engineer Pilot Retrospective: Food Pairing Built Without Success Metrics, Shut Down After Five Months

YogiyoYogiyo·Original
Operator Bae ChangHyun

Key point

Kim Byeong-cheol said he found no evidence that Food Pairing increased orders and took the feature down five months later because usage had declined.

1 / 7

Details

  • Kim Byeong-cheol of the Checkout team at Yogiyo's R&D Center said that Today's Food Pairing, built during the Product Engineer pilot, showed no evidence of increasing orders, and recalled taking it down five months later after seeing a decline in feature visits.
  • They built a working version with AI tools in 7 days, but it took 39 days from kickoff to full exposure, followed by another 32 days before it was released to users.
  • About 23,000 people opened Food Pairing over five months, but there was no evidence that it increased orders.
  • Feature visits fell from about 4,200 people in the first week to around 800 per week in July and the 400s in September; the feature was taken down on October 2.

Why it was difficult to assess results

  • Of the people who clicked a recommended food and went to the search results, 31% placed an order within an hour, but 28% of users who only viewed the results and left also placed an order.
  • The feature was exposed to all users at once, with no control group, so it was impossible to determine whether Food Pairing drove orders.
  • The question of whether to continue the feature was first raised only on June 9, 22 days after launch, and success and shutdown criteria had not been set in advance.

What changed in the next project

  • In the next project, before deciding on a feature, they estimated the company's losses caused by the problem using data, and set a recovery target and conditions for rolling back before launch.
  • Half of the problem could be solved just by correcting records, so they started with a small backend task and put off the screen work.
  • Based on the experience of spending a month waiting during a total project period of 5.5 weeks, they focused on reducing wait times by automating ticket status changes, test-environment deployments, and order-flow validation.